Skip to main content

Listing broker remarks

***** NEW 2026 **** Full gut renovation - only the frame and foundation are pre-existing--assume everything else is NEW! Such an extensive list of special features and "new", you must see in person, also see attached list for full line up of features. This contractor thought of all the big things and the "little things" that matter to a new buyer. Gourmet kitchen for the foodie, penthouse suite and bathroom must be seen. EV charging station access from house to driveway, office nook, basement storage rack, moldings, high ceilings, wine refridgerator, washer and dryer included, cathedral ceilings, skylights, PVC deck, maintenance free siding, new roof, new heating, new AC, hardwood flooring throughout--zero carpets in this house! Energy efficient with a HERS rating of 58. Convenient Arlington Heights location seconds to Minuteman Bikeway and Mass Ave. OPEN HOUSE Sept 29 from 5:00 to 6:30 pm; October 3 and 4 from 11 to 1:00 pm. See you at this awesome house!!!— Goodwin Realty Group, LLC

Open Houses

Key details

  • 2,000 sq ft
  • 2,605 lot sq ft
  • 4 beds
  • 3 baths
  • 2026 built
  • $699 / sq ft
  • $7,352 2025 taxes
MLS #
7⁠3⁠5⁠7⁠2⁠0⁠8⁠6⁠
Last updated
Address
2 Summer Street Pl
Town
Arlington, MA
ZIP
02474
Deed (Bk/Pg)
72546 / 274

Map

Neighborhood: Arlington

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.

Ch. 91 Waterways License

An active MassDEP permit for a dock, pier, seawall, or other structure on or over a Massachusetts waterway. Many older licenses are not digitized; this record is provided for reference only.

Massachusetts Great Pond

A Great Pond under M.G.L. Ch. 91 — the Commonwealth retains public rights to fish and navigate these state-designated waters. Private docks and other waterfront structures require a Waterways License from MassDEP.

Likely Great Pond

The MLS listing describes this property as being on a Great Pond, which would be a state-designated water body under M.G.L. Ch. 91. GIS data did not independently confirm the pond name — verification needed.