Skip to main content

Listing broker remarks

MOVE-IN READY! Close before the school year starts! Welcome to the 2nd release on Holliston’s newest 3-home cul-de-sac. Occupying the cul-de-sac's most expansive lot, this 4-bed, 3.5-bath estate is rooted in Organic Modern design, pairing wide-plank European Oak with West Elm lighting. The main level features an executive office with custom built-ins, formal dining, and a chef’s kitchen boasting a white oak island, premium quartz & GE Café appliances. The culinary center flows into a casual eating area and a grand family room anchored by a statement architectural fireplace wall. Upstairs, a luxurious primary suite offers a spa en-suite and massive walk-in closet. Engineered with zero fossil fuels: high-efficiency insulation, Bosch heat pumps & an EV-ready 3-car garage. Downstairs, a sun-drenched, unfinished full walk-out lower level offers up to ~1,300 sq ft for future expansion. Backed by Holliston’s top schools, don't miss this opportunity!— O'Leary Homes

Key details

  • 3,400 sq ft
  • 1.27 acres
  • 4 beds
  • 3.5 baths
  • 2026 built
  • $485 / sq ft
MLS #
7⁠3⁠5⁠4⁠7⁠1⁠4⁠2⁠
Last updated
Address
105 Bonney Drive
Town
Holliston, MA
ZIP
01746
Deed (Bk/Pg)
72354 / 348

Map

Neighborhood: The Homes on Bonney Drive

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.

Ch. 91 Waterways License

An active MassDEP permit for a dock, pier, seawall, or other structure on or over a Massachusetts waterway. Many older licenses are not digitized; this record is provided for reference only.

Massachusetts Great Pond

A Great Pond under M.G.L. Ch. 91 — the Commonwealth retains public rights to fish and navigate these state-designated waters. Private docks and other waterfront structures require a Waterways License from MassDEP.

Likely Great Pond

The MLS listing describes this property as being on a Great Pond, which would be a state-designated water body under M.G.L. Ch. 91. GIS data did not independently confirm the pond name — verification needed.