Skip to main content

Listing broker remarks

An exceptional new-construction opportunity at 10 Plant Street, offering 4,767 square feet of beautifully designed living space, including a finished lower level. Currently under construction and anticipated to be ready by spring 2027, this thoughtfully planned home offers up to five bedrooms, 3.5 baths, and an impressive blend of timeless architecture, modern comfort, and high-end craftsmanship. With construction underway, there is still time for buyers to personalize the home by making select interior choices and finish selections. Ideally located near scenic walking trails and Maudslay State Park, with convenient highway access and just a short drive to downtown Newburyport’s restaurants, shops, waterfront, and nearby beaches. A rare opportunity to customize a substantial new home in one of the area’s most desirable settings. Interior photos shown are from a similar home constructed by the same builder and are intended to represent the quality and style of the finished product.Listed by Realty One Group Nest

Key details

  • 4,767 sq ft
  • 10,000 lot sq ft
  • 5 beds
  • 3.5 baths
  • 2027 built
  • $607 / sq ft
MLS #
7⁠3⁠5⁠9⁠3⁠3⁠9⁠4⁠
Last updated
Address
10 Plant St
Town
Newburyport, MA
ZIP
01950
Deed (Bk/Pg)
15233 / 207

Map

Neighborhood: Newburyport

National Historic Landmark

Federally designated as nationally significant: the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only: no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.

Ch. 91 Waterways License

An active MassDEP permit for a dock, pier, seawall, or other structure on or over a Massachusetts waterway. Many older licenses are not digitized; this record is provided for reference only.

Massachusetts Great Pond

A Great Pond under M.G.L. Ch. 91: the Commonwealth retains public rights to fish and navigate these state-designated waters. Private docks and other waterfront structures require a Waterways License from MassDEP.

Likely Great Pond

The MLS listing describes this property as being on a Great Pond, which would be a state-designated water body under M.G.L. Ch. 91. GIS data did not independently confirm the pond name; verification needed.