Skip to main content

Listing broker remarks

175 Klause Anderson Road is Lot 2. This is a flat wooded lot. No wetlanda or steep slopes, so there is a lot of design flexibility. There is plenty of room for a swimming pool. This is a really beautiful lot. We will be happy to meet with you to walk this lot and to discusss the building process. We have suggested several home designs, however, we will work with you to build the custom home that you want. This proposed beautiful Colonial style home features a great open floor plan with a stone fireplace in the Great Room, a first floor master bedroom suite as well as a second floor finished bonus room thet could be an oversized 4th bedroom Our mission is to have you "Live Happily Ever After". These homes will be built by Blue Sky Builders. They have been building custom homes in Northern Connecticut and Western Mass for over 30 years and specialize in upscale energy efficient new construction. These homes are built tight to minimize outside air flow and are meticulosly insulated.— MacNaughton Real Estate

Key details

  • 2,579 sq ft
  • 3.80 acres
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $333 / sq ft
  • $53 2026 taxes
MLS #
7⁠3⁠4⁠8⁠3⁠3⁠7⁠8⁠
Last updated
Address
177 Klaus Anderson Road
Town
Southwick, MA
ZIP
01077
Deed (Bk/Pg)
22395 / 155

Map

Neighborhood: Southwick

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.

Ch. 91 Waterways License

An active MassDEP permit for a dock, pier, seawall, or other structure on or over a Massachusetts waterway. Many older licenses are not digitized; this record is provided for reference only.

Massachusetts Great Pond

A Great Pond under M.G.L. Ch. 91 — the Commonwealth retains public rights to fish and navigate these state-designated waters. Private docks and other waterfront structures require a Waterways License from MassDEP.

Likely Great Pond

The MLS listing describes this property as being on a Great Pond, which would be a state-designated water body under M.G.L. Ch. 91. GIS data did not independently confirm the pond name — verification needed.